Gaceta Oficial
Approval of the expansion plan for the National Interconnected System for the year 2025, presented by the Empresa de Transmisión Eléctrica, S.A. (ETESA).
Article PDF Official Gaceta Relevance 75
The National Authority of Public Services (AUTORIDAD NACIONAL DE LOS SERVICIOS PÚBLICOS - ASEP) approves through this Resolution the expansion plan for the National Interconnected System (PESIN) for the year 2025, submitted by the Empresa de Transmisión Eléctrica, S.A. (ETESA). The plan outlines the necessary electrical transmission infrastructure projects to ensure energy supply at the national level. The resolution includes detailed single-line diagrams for the load and demand conditions projected for the period.
p. 2–202
Approval of the Expansion Plan of the National Interconnected System corresponding to the year 2025, presented by the Empresa de Transmisión Eléctrica, S.A. (ETESA).
Article PDF Official Gaceta Relevance 75
The resolution approves the Expansion Plan of the National Interconnected System for the year 2025, presented by the state-owned company Empresa de Transmisión Eléctrica, S.A. (ETESA). This technical document details the necessary investments and infrastructure projects to guarantee the stability and capacity of the electricity supply nationwide. The measure seeks to strengthen the power transmission network to meet the country's growing energy demand and improve the efficiency of the interconnected system.
p. 3–202
Approval of the 2025 Expansion Plan for the National Interconnected System, submitted by the Empresa de Transmisión Eléctrica, S.A. (ETESA).
Article PDF Official Gaceta Relevance 75
This Resolution approves the 2025 Expansion Plan for the National Interconnected System (SIN), submitted by the transmission company Empresa de Transmisión Eléctrica, S.A. (ETESA). The detailed technical document provides diagrams, projections, and operational schemas necessary for the development and strengthening of the country's electrical transmission infrastructure. The plan includes specifications for various load scenarios, categorized by dry and wet seasons, as well as projected peak demands.
p. 3–202
Resolution approving the Expansion Plan of the National Interconnected System for the year 2025, presented by the Empresa de Transmisión Eléctrica, S.A. (ETESA).
Article PDF Official Gaceta Relevance 75
The National Public Services Authority (AUTORIDAD NACIONAL DE LOS SERVICIOS PÚBLICOS) formally approves the 2025 Expansion Plan for the National Interconnected System, submitted by the transmission company ETESA. The technical document outlines the required infrastructure investments and transmission grid improvements necessary to ensure electrical supply and system stability throughout Panama.
p. 2–206
Approval of the expansion plan for the national interconnected system for the year 2025, presented by the company Empresa de Transmisión Eléctrica, S.A. (ETESA).
Article PDF Official Gaceta Relevance 75
The National Public Services Authority (ASEP) approves the expansion plan for the national interconnected system for the year 2025, as presented by the company Empresa de Transmisión Eléctrica, S.A. (ETESA). This plan details the electrical infrastructure projects necessary to strengthen the capacity and reliability of the national transmission network. The document includes a series of flow diagrams and technical schematics of the projected main transmission system.
p. 3–202
Resolution approving the Expansion Plan of the National Interconnected System for the year 2025, presented by the EMPRESA DE TRANSMISIÓN ELÉCTRICA, S.A. (ETESA). Volume XV
Article PDF Official Gaceta Relevance 65
The National Public Services Authority (Autoridad Nacional de los Servicios Públicos) approves, through this resolution, the Expansion Plan of the National Interconnected System for the year 2025. The plan, prepared and submitted by the Empresa de Transmisión Eléctrica, S.A. (ETESA), details the electrical infrastructure works necessary to guarantee the stability, capacity, and quality of power supply nationwide. This resolution, classified as Volume XV, includes a series of technical diagrams and schematics illustrating the configuration of the main transmission system planned for the year 2027 under various operating and demand conditions.
p. 3–202
Approval of the Expansion Plan for the National Interconnected System for the year 2025, presented by EMPRESA DE TRANSMISIÓN ELÉCTRICA, S.A. (ETESA).
Article PDF Official Gaceta Relevance 75
The National Public Services Authority (AUTORIDAD NACIONAL DE LOS SERVICIOS PÚBLICOS) approves the Expansion Plan for the National Interconnected System (PESIN) for the year 2025, which was presented by Empresa de Transmisión Eléctrica, S.A. (ETESA). This technical document details the projections and necessary investments to strengthen Panama's electrical transmission grid, ensuring the capacity and reliability of electricity supply in the country. The included annex contains the diagrams and technical specifications of the transmission works projected for the period.
p. 3–202
Granting of a Type “A” travel agency operating license to the company BULWARK ALLIANCE, S.A., whose legal representative is Mrs. Ninfa Ergenis Barria Castillo de Pérez, to operate an agency under the trade name GO TOUR PANAMÁ.
Article PDF Official Gaceta Relevance 45
The Panama Tourism Authority grants a Type “A” operating license to the company BULWARK ALLIANCE, S.A. to operate the travel agency under the trade name GO TOUR PANAMÁ in Paso Canoas, Chiriquí Province. General management will be headed by Lourys Yaneth Cedeño Alcoser.
p. 3–4
Resolution regarding the request submitted by the concessionaire APROINSA, S.A. to modify the technical operating parameters of the 91.3 MHz frequency at the transmission site located in Cerro Azul, Panama Province.
Article PDF Official Gaceta Relevance 30
The National Authority for Public Services (ASEP) authorizes the company APROINSA, S.A. to modify the technical parameters for the 91.3 MHz frequency at the Cerro Azul site in Panama Province. The adjustments include the geographic coordinates, the antenna system, and an increase in the effective radiated power (ERP) from 12,472 watts to 50,578.9727 watts.
p. 5–8
Resolution regarding the request submitted by the concessionaire APROINSA, S.A. to modify the technical operating parameters of the 94.5 MHz frequency at the transmission site located in Cerro Azul, Panama Province.
Article PDF Official Gaceta Relevance 30
The National Authority for Public Services (ASEP) authorizes APROINSA, S.A. to modify the technical parameters for the 94.5 MHz frequency at Cerro Azul, Panama Province. The adjustments cover the coordinates, the radiation system, and an increase in effective radiated power (ERP) from 9,310.43 watts to 11,322.4395 watts.
p. 9–12